We have own standard mould frame for cap mould and handle mould, we make complete inspection on mould to ensure the structure consistence and spare parts standardized. In addition, we will do independent standardization test on mould cooling system and hot runner system.
When we get samples or drawing of product, we always make all round analysis and inspection, such as moulding process feasibility, mould structure and movement feasibility, all the related plastic components matching situation, etc.
Control the size precisely, make self-inspection on each tooling spare parts in according to the requirements of drawing size and tolerance limits control. It is not allowed to make previous wrong workpiece inflow to the next tooling steps. All workpieces must be check up and control the precision by 3D coordinate measures. Self-inspection of tooling workpiece and acceptance check made by quality department.
With accurate analysis, predictable mold design rationality analysis, processing analysis and mold structure application, we provide customers with professional solutions that are suitable for mold performance and technical specifications. The analysis includes mold flow analysis, mold ejection, cooling system, rationality of guide system, application of mold parts specification, customer's machine selection and application of special requirements, etc.
We take full range test and analysis on product size, appearance, injection techniques and Physical Parameter. We use professinal inspection standard and tool for inspection. Along with our continuous improvement on equipments and measuring and test instruments, our product inspection tends to be more professional.
In according to order documents, customer requirement and company standard, we will make strict inspection and acceptance check for mould. These related documents should be recorded and documented with other inspection report before delivery.
We have own standard mould frame for cap mould and handle mould, we make complete inspection on mould to ensure the structure consistence and spare parts standardized. In addition, we will do independent standardization test on mould cooling system and hot runner system.